Pallet Storage Efficiency: Measuring the Space You Actually Use

2026-10-08  ·  Back to blog index

Direct answer: Pallet storage efficiency is measured as pallet positions actually usable divided by the floor and height available — not positions drawn on a plan. The gap between the two comes from aisle count, honeycombing, partial pallets and blocked positions.

Occupancy is not efficiency

Most sites track occupancy, meaning the share of pallet positions that are full. Occupancy says nothing about whether the space is being used well, because a full warehouse can still be wasting half of its cube. Two further measurements are more useful: how much of the vertical cube above each occupied position is genuinely unusable, and how many of the occupied positions hold slow-moving stock that could sit deeper in the building or higher up. Neither figure requires software: a level-by-level walk of one aisle with a clipboard will produce a usable baseline in an afternoon.

A simple way to start is to draw the storage area to scale and mark, level by level, which positions hold stock picked more than once a week. In most warehouses the result is a small fast-moving band near the doors and a large slow-moving mass at the back and top, which is exactly the pattern a layout change can exploit. We produce this map as part of the free CAD layout, so establishing the baseline costs nothing. Repeat the exercise after any layout change, because the pattern moves as soon as the product mix or the order profile moves.

Slotting by turnover

Once the map exists, move fast movers to the positions that cost the least travel: ground and second levels close to the dispatch doors. Carton flow and pallet flow lanes suit this zone because gravity keeps first-in first-out rotation without power, with carton lanes specified at 300 to 1,000 kg per level and pallet flow at 500 to 1,500 kg per pallet. Reserve storage above or behind the pick face then holds the replenishment stock for the same SKU. Separating the pick face from the reserve position is what stops pickers and replenishment trucks competing for the same aisle.

Pallet choice plays a part as well. Steel pallets that stack six to ten pieces high let you build a buffer block without racking at all, which is useful for seasonal peaks, and because the same pallet works on a rack beam, on a conveyor and in a truck there is no transfer handling between zones. Galvanised versions are specified for cold rooms and outdoor staging where a wood pallet would absorb moisture and lose rating. Steel pallets carry a five-year warranty, and because they are dimensionally stable they also sit correctly on beams and conveyors.

Where recovered space usually comes from

Three changes recover space most often. Reducing aisle count by moving slow movers into double-deep or drive-in lanes raises storage density by roughly thirty to forty per cent compared with standard selective racking; compressing aisle width with very narrow aisle racking adds about thirty per cent more positions; and adding a mezzanine turns unused headroom into two or three extra tiers of pick floor. Each has a capital cost, so compare them on one drawing. Whichever option you choose, the change should be modelled against your own pallet dimensions rather than a generic rule of thumb.

The mezzanine route suits operations that are picking rather than storing. Structural platforms carry 300 to 1,000 kg per square metre and rack-supported versions 300 to 800 kg per square metre, both with 1,100 mm safety railing, integrated staircases and a ten-year structural warranty. Whichever route you take, begin with the free CAD layout: send floor plan, clear height, pallet dimensions and weights and throughput, and the comparison comes back within 48 hours. Quotations are returned within 24 hours and every quoted capacity is confirmed in writing before an order is placed.

FAQ

How do I know whether to buy more racking or use space better?

Measure before buying. Count the pallet positions you have against the positions actually occupied, then mark how much of the cube above each occupied position is unusable and how many occupied positions hold slow-moving stock. If the answer is a large slow-moving mass, a slotting change or a higher-density zone usually costs less than additional racking in a building you already pay for.

Does higher density always mean better efficiency?

No. Density is bought with selectivity: deeper lanes mean fewer stock-keeping units accessible from the aisle, and driving into a structure is slower and harder on the frame than picking from a face. The right test is throughput per square metre rather than pallets per square metre. We model both versions in the CAD layout so you can see the selectivity you give up before committing budget.

What should I send to get a storage efficiency review?

The floor plan, the usable clear height, pallet dimensions and weights including any overhang, and the daily pallet movements or throughput. From that our engineers return a free CAD layout with capacity calculations, a structural calculation to FEM 10.2 and EN 15512 and FOB pricing, normally within 48 hours. Standard production then runs 18 to 30 days per container.

All figures above refer to standard product data sheets; final confirmation is subject to written quotation.

Back to homepage →